For submission by posted due date (start of 2nd week of classes, 2nd term): This is meant as a way to provide final closure to your project – where equipment is to be transferred, what items will be held by the team, and what responsibilities are to be done by the group after the project conclusion. Use the online guide to Project Completion Reports: ProjectLab – GuideToProjectCompletionReport (PDF) », (MS Word) » Although this document is not marked, you must complete a Project Completion Report and return to the Project Lab prior to your final mark being released in late Feb / early March 2010. Failure to do so will likely result in your mark for the course being withheld. The APSC459 students start very soon – clean up your areas in the Project Lab, and return your empty storage bins to the lab. APSC 459 students will be moving into the lab ASAP. Please notify the lab if you cannot get your project transfer and cleanup fully completed by the START OF THE 3RD WEEK OF CLASSES IN JAN. Your material may be placed in storage if you do not notify us in advance of your plan. Please forward copies of your reports directly to your sponsors, and ensure that they have received all materials, deliverables, software, and other material that they should receive as part of the conclusion of the project. It is the responsibility of each group to ensure that the Project Sponsor receives all of the information. All Project Sponsors will receive a note from the Project Lab indicating that students will be forwarding all deliverables and reports back to the sponsors, and will be asked to submit a questionnaire to provide feedback for the team and the lab and deliverables. Please plan on returning your keyfobs after the 479 course is complete and your area is no longer in use. The lab will be in general use by the incoming students, and access should be transferred over to them as the term progresses. At minimum, please drop by to chat with Jon or Bernhard to discuss extended keyfob access for the Project Lab.Final Report Submission
Project Completion Report
Cleanup
Final Reports and Materials Back to Sponsors
Keyfob Return
- Home
- ProjectLab
- ENPH 479 (Fall 2019)
- ENPH 459 (Fall 2019-Spring 2020)
- ENPH 353 - 2019 Term 2
- ENPH 253 (Summer 2019)
- Guides for 459/479
- ENPH 480/481
- Info for Project Sponsors
- Available Projects
- Hennings 115
- Lab Resources
- Student Awards
- Sign-Up Page
- Jobs
- Events and Talks
- Course Archive
- APSC 278 - 2018March
- ENPH 259 - presentations (2017 Nov)
- Sign-Up Page (APSC 101)
- Arduino (CUEBC 2016)
- COMM 386p (fall 2016)
- COMM 386p (Spring 2016)
- BAEN 580B (2015)
- BAEN 580B (2014)
- BAEN 542 (2013)
- Arduino Hands-On (2015)
- APSC 150 (Feb 2015)
- APSC 150 (Sept 2014)
- APSC 150 Tut 1.4 (Jan 2013)
- ENPH 459 (fall 2014)
- APSC 150 - electronics (2013)
- APSC 150 - Hand Tools (2013)
- IGEN 230 - mini-bootcamp (2012)
- PHYS 350 - projects (2017Jan-Apr)
- ENPH 479 (fall 2017)
- ENPH 479 (fall 2016)
- ENPH 479 (fall 2015)
- ENPH 479 (fall 2014)
- ENPH 479 (2013)
- ENPH 479 (2012)
- ENPH 479 - 2011/12
- APSC 479 - 2010/2011
- APSC 479 - 2009/10
- ENPH 459 (Fall 2018-Spring 2019)
- ENPH 459 (fall 2017)
- ENPH 459 (fall 2016)
- ENPH 459 (fall 2015)
- ENPH 459 (2013)
- ENPH 459 (2012)
- ENPH 459 - 2011/12
- APSC 459 - 2009/10
- APSC 459 2010/2011
- ENPH 253 (2018)
- ENPH 253 (2017)
- ENPH 253 (2016)
- ENPH 253 (2015)
- ENPH 253 (2014)
- ENPH 253 (summer 2013)
- ENPH 253 - 2012
- Phys 253-2011
- PHYS253 - 2010
- Phys 253 2009
- MINE 432 - Fall 2014
- PHYS 350 - projects (2011/12)
- MINE 432 - Fall 2010