Homework: Bootcamp Work (in any order): Make sure to see all the links in the text below to understand what you are supposed to be doing. Wear goggles! Step 1) Every Student has to make one of each: Step 2) Assembly: Every work bench team will assemble one tape follower. Pick the best parts for this. Important: More things that you will definitely need later in the course: Videos from the past: One, two, three, four, and then you can still look for more. . Feedback: Please tell us if you think something is missing here, or wrong. .
- Home
- ProjectLab
- ENPH 479 (Fall 2019)
- ENPH 459 (Fall 2019-Spring 2020)
- ENPH 353 - 2019 Term 2
- ENPH 253 (Summer 2019)
- Guides for 459/479
- ENPH 480/481
- Info for Project Sponsors
- Available Projects
- Hennings 115
- Lab Resources
- Student Awards
- Sign-Up Page
- Jobs
- Events and Talks
- Course Archive
- APSC 278 - 2018March
- ENPH 259 - presentations (2017 Nov)
- Sign-Up Page (APSC 101)
- Arduino (CUEBC 2016)
- COMM 386p (fall 2016)
- COMM 386p (Spring 2016)
- BAEN 580B (2015)
- BAEN 580B (2014)
- BAEN 542 (2013)
- Arduino Hands-On (2015)
- APSC 150 (Feb 2015)
- APSC 150 (Sept 2014)
- APSC 150 Tut 1.4 (Jan 2013)
- ENPH 459 (fall 2014)
- APSC 150 - electronics (2013)
- APSC 150 - Hand Tools (2013)
- IGEN 230 - mini-bootcamp (2012)
- PHYS 350 - projects (2017Jan-Apr)
- ENPH 479 (fall 2017)
- ENPH 479 (fall 2016)
- ENPH 479 (fall 2015)
- ENPH 479 (fall 2014)
- ENPH 479 (2013)
- ENPH 479 (2012)
- ENPH 479 - 2011/12
- APSC 479 - 2010/2011
- APSC 479 - 2009/10
- ENPH 459 (Fall 2018-Spring 2019)
- ENPH 459 (fall 2017)
- ENPH 459 (fall 2016)
- ENPH 459 (fall 2015)
- ENPH 459 (2013)
- ENPH 459 (2012)
- ENPH 459 - 2011/12
- APSC 459 - 2009/10
- APSC 459 2010/2011
- ENPH 253 (2018)
- ENPH 253 (2017)
- ENPH 253 (2016)
- ENPH 253 (2015)
- ENPH 253 (2014)
- ENPH 253 (summer 2013)
- ENPH 253 - 2012
- Phys 253-2011
- PHYS253 - 2010
- Phys 253 2009
- MINE 432 - Fall 2014
- PHYS 350 - projects (2011/12)
- MINE 432 - Fall 2010